Crossing of the Po River
Cremona, Italy, 2022
Client Itinera Inc.
The bridge is part of the detail design of the motorway segment comprising the new Castelvetro toll area, the connection with the SS 10 “Padana Inferiore” road and the completion of the motorway link to the SS 234 road. The main crossing shows a bow-tie steel arch bridge with “network” hangers system, span 200m, with access viaducts featuring steel-concrete composite continuous girders of span from 50 to 75 m, for a total length of about 2 km.