Author: luciano

Arch bridge on the Tronto

Ascoli Piceno, Italy, 2010, 2019

Client Municipality of Ascoli Piceno

Design of a skew arch bridge on the Tronto river, 90 m span, within a new by-pass in the Southern part of the town. Due to cost boundaries, it was instead selected a continuous composite deck alternative, also designed by E.D.In.

EDIN Ponti Ad Arco 1 Arco Sul Tronto
EDIN Ponti Ad Arco 2 Arco Sul Tronto
EDIN Ponti Ad Arco 3 Arco Sul Tronto

Bergamo-Lecco railway line

Lombardia, Italia, 2020

Client Italferr Inc

Reclassification assessment and upgrading for seven existing masonry bridges on the Curno-Ponte San Pietro segment, Bergamo-Lecco railway line. Noticeable the bridge on the Brembo River, opened in 1863 and comprising 11 arches with 32m maximum span.

EDIN Ponti Ad Arco Bergamo Lecco 1
EDIN Ponti Ad Arco Bergamo Lecco 2

Miscellaneous cable stayed bridges,
an overview

Road and rail Fehmarnbelt Crossing, Denmark to Germany. Participation to the International Board for the review of the bridge alternative, comprising two twin 900 m cable stayed spans and 200 m span access viaducts for a total length of about 19 km, Client Femern A/S, Denmark, 2009

Stonecutters Bridge, when opened in 2008 second cable stayed worldwide with a centre span of 1018 m, Hong Kong. Participation to the International Board for the review of the design, Client ARUP & Partners Hong Kong-COWI-BMT Asia Pacific JV, 2002-2003

Favazzina viaduct near Scilla, with a main span of 220 m is one of the most relevant of the A3 motorway in Southern Italy. Scope of work comprised numerical analyses and construction drawings of steel deck components, Client INCO Inc., 2008

Rail bridge on the Po River, 200 m centre span, Italy, the main structure of the Milano-Bologna High Speed Line. Dynamic railway runnability analysis, Client Tecnoproject Ltd, 1995

Wadi Dib Bridge, 280 m centre span, Algeria, overpassing the artificial reservoir formed by the creek. Seismic response analysis, Client Tecnoproject Ltd, 1994

Wadi Kuf Bridge, 282 m centre span, Libya, the main span designed by Riccardo Morandi. Numerical analysis of erection stages for the retrofitting project, Client Tecnoproject Ltd, 1994

Kirumi Bridge, 150 m centre span, Tanzania, 1981-84, numerical analysis of the erection stages, Client GSLE Inc., 1981-1984

Designs or consultancy for international tenders, not awarded or suspended: 550 m span road and rail cable stayed bridge & access viaducts for the 3rd Tagus crossing (Client Tavetejo Consortium, 2008-2009); prestressed concrete cable stayed bridge, RN 77 motorway, Algeria (Client Condotte Inc., 2008); two cable stayed bridges on the Ragusa-Catania motorway (Client Condotte Inc., 2007); 490 m span road and rail cable stayed bridge on the Oresund (Alternative design development, 1995, Client CMF Sud S.p.A. and Burmeister & Wein A/S)

Preliminary project for the redevelopment and recovery of the slopes of the Aventino Hill, Rome, with mechanized connection between the Tiber and the Orange Garden, terrace overlooking the Tiber and cable-stayed bridge on the route of the ancient Ponte Sublicio, Client: Resources for Roma SpA, 2006

Bridge Of Alkuf Valley REV01
Hong Kong Stonecutters Bridge REV01
ALGERIA RN77 REV01
Kirumi REV01
Viadotto Favazzina REV01
Femern REV01

Bridge on the Congo Rive

Democratic Republic of the Congo, 2017

Client Communauté Economique des Etats de l’Afrique Centrale

Road and rail cable stayed bridge on the Congo River, main span 200 m, within the Kinshasa-Ilebo link. Independent check of the design, in JV with Italferr Inc.

1 Rev01 Jpg
3 REV01
2 REV01
Fotoinserimento REV01
Sezione Trasv REV01
Profilo REV01

Storstrøm Crossing

Denmark, in progress

Clients Ramboll A/S, SBJV

The Storstrøm is a road, railway and pedestrian bridge that crosses the Storstrømmen between the islands of Falster and Masnedø. Of about 4 km total length offshore, with 80 m typical spans and as main crossing a single mast cable stayed bridge with two twin 180 m spans. E.D.In. is collaborating to the preparation of the construction drawings, with scope of work the substructures of the entire bridge.

Storstrøm
8 REV02
6 REV02
Storstrøm
Storstrøm
Storstrøm
Storstrøm
Storstrøm
Storstrøm
  • Storstrøm
  • 8 REV02
  • 6 REV02
  • Storstrøm
  • Storstrøm
  • Storstrøm
  • Storstrøm
  • Storstrøm
  • Storstrøm
  • Storstrøm

  • 8 REV02

  • 6 REV02

  • Storstrøm

  • Storstrøm

  • Storstrøm

  • Storstrøm

  • Storstrøm

  • Storstrøm

  • Storstrøm
  • 8 REV02
  • 6 REV02
  • Storstrøm
  • Storstrøm
  • Storstrøm
  • Storstrøm
  • Storstrøm
  • Storstrøm

Hisgaura cable stayed bridge

Colombia, 2016

Client Sacyr Colombia

The Hisgaura cable stayed bridge, main span 330 m, is located on the Malaga-Curos route in the Santander region and is the second for span in Columbia. E.D.In. carried out an independent check of the final design on behalf of the Contractor with strongly critical outcome, such to induce its fundamental review.

Hisgaura
5c1258bf4dd39 REV01
Hisgaura
Puente Hisgaura REV01

Sydney North Rail

Sydney, Australia, 2015 – 2016,

Client Salini Impregilo Inc.

The Sydney North Rail is a 4 km link entirely on viaduct, comprising as main crossing the Windsor Road cable stayed bridge, centre span 180 m, and numerous spans between 30 and 40 m in length. Scope of work comprised the independent numerical analyses of the erection stages of the main crossing, as well as consultancy for the resolution of significant issues arisen during the construction, with permanent E.D.In. staff on site.

Sydney Metro Skytrain SRD Last Segment Night Lift 1700x1133px REV01.
SYDNEYMETRO 7.REV 02
SYDNEYMETRO 6 REV01
SYDNEYMETRO 5
SYDNEYMETRO 3 REV01.
SYDNEYMETRO 4 REV01.
SYDNEYMETRO 2. REV01
DlB1qQ8X0AE2087 REV01.
Sydney Disegni REV03

New Gerald Desmond

Long Beach, California, US, 2017-2018

Clients Musick Peeler & Garrett LPP, FCC – Shimmick –Salini Impregilo JV

The New Gerald Desmond cable stayed bridge will replace, with a main span of 410 m and a clearance of over 60 m, the existing steel arch truss. Scope of work comprised in a first instance the preparation of an expert witness report on the design of the composite bridge deck, featuring a post tensioned lightweight concrete slab. In a second phase E.D.In. carried out an independent check of the erection stages, with an “over the shoulder review” carried out at the offices of the designer ARUP in New York.

 6 REV01
 5 REV 01
Desmond
Desmond
Desmond
Desmond

Miscellaneous Suspension Bridges,
an overview

Santos Guarujà Suspension Bridge, Sao Paulo, Brazil, main span 750 m, main crossing in an important road link on the Sao Paulo Harbour, preliminary design. Client ECORODOVIAS, 2020, at the moment discontinued due to the Sars Cov 2 epidemic.

Feasibility studies for two 2200 m span suspension bridges on the Sunda Strait, Indonesia, Stretto di Messina SpA, 1996, 2009, 2012

Collaboration with Dr. William C. Brown (Brown Beech Ltd) for studies comprising suspension bridges on the Rion-Antirion crossing, Dardanelles Straits, Java to Bali crossing, third Bosphorus crossing, Izmit Bay, 1986-2003.

Humber suspension bridge, centre span 1410 m, then the largest worldwide, research project on the aerodynamic stability in erection, University of Manchester Institute of Science and Technology, 1977-78.

F. Brancaleoni, D.M. Brotton: Analysis and Prevention of Suspension Bridge Flutter in Construction, International Journal for Earthquake Engineering and Structural Dynamics, Vol. 9, 489-500,1981

F. Brancaleoni: The Construction Phase and its Aerodynamic Issues, in Aerodynamics of Large Bridges, ed. A. Larsen, Balkema, 1992

Miscellaneous consultancy or designs for international tenders, not awarded or suspended: Chacao Suspension Bridge, JV with RAMBOLL A/S, client Salini Impregilo 2013, 3rd Bosporus Crossing, 1400 m main span, Client Impregilo, 2011

15 July Martyrs Bridge

Turkey, 1985, 1988

The second bridge to be built across the Bosphorus, with its span of 1074 m links Ortaköy (Europe) and Beylerbeyi (Asia) in Istanbul. E.D.In. did collaborate with the Designer William C. Brown for the catwalk design and for the analysis of the erection stages. After completion was in charge of installing and operating for one year a semi-permanent monitoring system, leading state of the art at the time, with numerical analyses and identification of the experimental behaviour of the bridge, with the findings transferred to the design of the Messina Strait Bridge design.

F. Brancaleoni, W.C. Brown, C. Valente, SEMI-PERMANENT MONITORING OF THE FATIH SULTAN MEHEMET SUSPENSION BRIDGE, Proc. 2nd International Conference on Bridge Management, Guildford, Surrey, April 1993

Bosforo 1
Bosforo 2
Bosforo 3
Bosforo 4
EDIN S.r.l.

E.D.IN. Ltd.
Consulting Engineers

Via Casilina, 3/t
00182 - ROMA
Phone.: +39 06 5452591
Fax.: +39 06 54525939
Email: info@ediningegneria.com
Vat Number: 01275921003
Codice Fiscale: 04016070585


Copyright Edin Ltd